Functional adaptation of ATO2 integrated water system through the realization of a sand recovery line by a soil-washing process
The project concerns the functional adaptation of ATO2 integrated water system through the realization of a sand recovery line by a soil-washing process located in Ostia purification plant.
The work area is 7.370 m² ca.: there will be a 1620 building in metal carpentry designated to the process and a 210 m² concrete building which contains filter beds (biofilter)
2Zero Projects team is made of six professionals led by Eng. Claudio Migliorini (project manager) who has planned the final design and the working plan managing the architectural and structural matters, the external works like traffic/mobility and water collection network, demolition plan and crushing works.